Micro Water Plant in Ghana

Practical: Construction and commissioning was carried out within 20 minutes by two young women without detailed technical knowledge.
On the basis of this problem-free commissioning directly on site it becomes clear that the Micro Water Plant meets the requirements for which it was developed and produced.
The construction, commissioning and production of drinking water can be carried out at any time, even by laymen.